- Year of Implementation: 2018
- Country: Spain
- Place of Implementation: Antzuola
- Segment: Industry
Description of Solution
The aim of this project is to reduce lighting consumption, to accomplish this a complete lighting replacement was designed. The installation was divided into 6 groups, each controlled by RF sensors. The sensors are responsible for light control. In case of power failure and its restoration, the sensors are programmed to restore their last operating state. In the event of an emergency, a control has been programmed to turn the LED lights 100% on or completely off.
Technology
Poseidon Industry – wireless lighting control system.